Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness - MaRDI portal

Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness

From MaRDI portal
Publication:2147170

DOI10.1016/j.cor.2022.105880OpenAlexW4281390184MaRDI QIDQ2147170

Victor Fernandez-Viagas, Bruno de Athayde Prata, Jose M. Framinan, Carlos Diego Rodrigues

Publication date: 22 June 2022

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2022.105880





Uses Software


Cites Work