Optimizing resource-constrained project scheduling problem considering the reliability function
From MaRDI portal
Publication:2163632
DOI10.1155/2022/7711383zbMath1497.90097OpenAlexW4283689525MaRDI QIDQ2163632
M. Vaez-Ghasemi, Saeideh Naderi, Farzad Movahedi Sobhani
Publication date: 10 August 2022
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2022/7711383
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
- Unit-time scheduling problems with time dependent resources
- An exact algorithm for project scheduling with multiple modes
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
- Project selection, scheduling and resource allocation with time dependent returns
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic
This page was built for publication: Optimizing resource-constrained project scheduling problem considering the reliability function