Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A risk-averse two-stage stochastic programming model for a joint multi-item capacitated line balancing and lot-sizing problem - MaRDI portal

A risk-averse two-stage stochastic programming model for a joint multi-item capacitated line balancing and lot-sizing problem

From MaRDI portal
Publication:2171582

DOI10.1016/j.ejor.2021.09.043OpenAlexW3205477704WikidataQ114184409 ScholiaQ114184409MaRDI QIDQ2171582

Yanyan Li

Publication date: 9 September 2022

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2021.09.043




Related Items (2)



Cites Work




This page was built for publication: A risk-averse two-stage stochastic programming model for a joint multi-item capacitated line balancing and lot-sizing problem