The repair kit problem with imperfect advance demand information
From MaRDI portal
Publication:2171602
DOI10.1016/j.ejor.2022.04.019OpenAlexW4224270783MaRDI QIDQ2171602
Christoph Rippe, Gudrun P. Kiesmüller
Publication date: 9 September 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2022.04.019
Related Items (2)
Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests ⋮ The added value of advance demand information for the planning of a repair kit
Cites Work
- Modelling imperfect advance demand information and analysis of optimal inventory policies
- Multiple period repair kit problem with a job completion criterion: A case study
- Purchasing demand information in a stochastic-demand inventory system
- Inventory management in a closed-loop supply chain with advance demand information
- The repair kit problem with positive replenishment lead times and fixed ordering costs
- Improving supply-chain performance by sharing advance demand information
- The multiple-job repair kit problem
- Optimising a general repair kit problem with a service constraint
- Kanban-based pull systems with advance demand information
- Integrating Replenishment Decisions with Advance Demand Information
- OPTIMAL PRODUCTION POLICIES WITH MULTISTAGE STOCHASTIC DEMAND LEAD TIMES
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
- Modeling the Benefits of Sharing Future Demand Information
- Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
- Note—Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items
- Optimizing Field Repair Kits Based on Job Completion Rate
- The Repair Kit Problem Revisited
- Note—A Multiple-Item Inventory Model with a Job Completion Criterion
- Improving spare parts management for field services: a model and a case study for the repair kit problem
- Production-inventory systems with imperfect advance demand information and updating
- Customer-Order Information, Leadtimes, and Inventories
- The use of advance demand information in a project-based supply chain
This page was built for publication: The repair kit problem with imperfect advance demand information