Solving permutation flow shop scheduling problem with sequence-independent setup time
From MaRDI portal
Publication:2176034
DOI10.1155/2020/7132469zbMath1442.90066OpenAlexW3000793732WikidataQ126301636 ScholiaQ126301636MaRDI QIDQ2176034
Said Aqil, Karam Allali, Jabrane Belabid
Publication date: 30 April 2020
Published in: Journal of Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2020/7132469
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Efficiency thresholds of group based job scheduling in HPC systems ⋮ Group based job scheduling to increase the high-performance computing efficiency ⋮ Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates
Uses Software
Cites Work
- Unnamed Item
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- Some efficient heuristic methods for the flow shop sequencing problem
- A fast tabu search algorithm for the permutation flow-shop problem
- A new constructive heuristic for the flowshop scheduling problem
- A genetic algorithm for flowshop sequencing
- Improved genetic algorithm for the permutation flowshop scheduling problem.
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times
- A comprehensive review and evaluation of permutation flowshop heuristics
- A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
- An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
- Simulated annealing and genetic algorithms for minimizing mean flow time in an open shop
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- Two MILP models for the N × M SDST flowshop sequencing problem
- Optimal two- and three-stage production schedules with setup times included
- New MILP models for the permutation flowshop problem
- The Complexity of Flowshop and Jobshop Scheduling
- Comparative evaluation of MILP flowshop models
- Using iterated local search for solving the flow‐shop problem: Parallelization, parametrization, and randomization issues