Using the generalized maximum covering location model to control a project's progress
From MaRDI portal
Publication:2183555
DOI10.1007/s10287-018-0301-5OpenAlexW2789953091MaRDI QIDQ2183555
Narjes Sabeghi, Hamed Reza Tareghian
Publication date: 27 May 2020
Published in: Computational Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10287-018-0301-5
Uses Software
Cites Work
- Determining the timing of project control points using a facility location model and simulation
- Reactive scheduling in the multi-mode RCPSP
- A classification of predictive-reactive project scheduling procedures
- PSPLIB -- a project scheduling problem library
- The gradual covering decay location problem on a network.
- Optimal timing of project control points
- A maximal covering location model in the presence of partial coverage
- Executing production schedules in the face of uncertainties: a review and some future directions
- On Uncertainty, Ambiguity, and Complexity in Project Management
- The gradual covering problem
- Disruption management for resource-constrained project scheduling
- The generalized maximal covering location problem
- Timing control points via simulation for production systems under random disturbances
This page was built for publication: Using the generalized maximum covering location model to control a project's progress