Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines
From MaRDI portal
Publication:2187981
DOI10.1155/2020/2939272zbMath1459.90103OpenAlexW3020055354MaRDI QIDQ2187981
Yajuan Han, Tian Zeng, Yunfang Peng, Beixin Xia
Publication date: 3 June 2020
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2020/2939272
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
- Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
- Part logistics in the automotive industry: decision problems, literature review and research agenda
- Approximative solutions to the bicriterion vehicle routing problem with time windows
- A multiobjective optimization algorithm to solve the part feeding problem in mixed-model assembly lines
- Scheduling in-house transport vehicles to feed parts to automotive assembly lines
This page was built for publication: Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines