The impact of a limited budget on the corrective action taking process
From MaRDI portal
Publication:2189899
DOI10.1016/j.ejor.2020.03.069zbMath1443.90193OpenAlexW3015198948MaRDI QIDQ2189899
Mario Vanhoucke, Annelies Martens, Jie Song
Publication date: 17 June 2020
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://biblio.ugent.be/publication/8665190
Related Items (2)
Using earned value management and schedule risk analysis with resource constraints for project control ⋮ Using schedule risk analysis with resource constraints for project control
Uses Software
Cites Work
- Determining the timing of project control points using a facility location model and simulation
- A buffer control method for top-down project control
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Developing activity duration specification limits for effective project control
- A simulation and evaluation of earned value metrics to forecast the project duration
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- Another Look at the PERT Assumptions
This page was built for publication: The impact of a limited budget on the corrective action taking process