Inspection location in capacity-constrained lines
From MaRDI portal
Publication:2201300
DOI10.1007/s10100-018-00604-xOpenAlexW2910280422MaRDI QIDQ2201300
Sigrún Andradóttir, Salih Tekin
Publication date: 29 September 2020
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-018-00604-x
Cites Work
- An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework
- A polynomial time algorithm for solving a quality control Station configuration problem
- Integrated quality and quantity modeling of a production line
- Performance modelling of serial production lines with inspection/repair stations
- Layer modelling for the inspection allocation problem in re-entrant production systems
- Imperfect Inspection in a Multistage Production Process
- Inspection for Circuit Board Assembly
- An optimization model for selective inspection in serial manufacturing systems
- Optimal Screening Plans for Nonserial Production Systems
This page was built for publication: Inspection location in capacity-constrained lines