Hybrid bat algorithm for flow shop scheduling problems
From MaRDI portal
Publication:2204236
DOI10.1504/IJMOR.2016.077560zbMath1452.90174OpenAlexW2466048847MaRDI QIDQ2204236
Publication date: 15 October 2020
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmor.2016.077560
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Parameter less hybrid IG-Jaya approach for permutation flow shop scheduling problem ⋮ Learning to select operators in meta-heuristics: an integration of Q-learning into the iterated greedy algorithm for the permutation flowshop scheduling problem ⋮ An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study
This page was built for publication: Hybrid bat algorithm for flow shop scheduling problems