Counting and enumerating feasible rotating schedules by means of Gröbner bases
From MaRDI portal
Publication:2228806
DOI10.1016/j.matcom.2014.12.002OpenAlexW2062348420MaRDI QIDQ2228806
Raúl M. Falcón, Eva Barrena, David Canca, Gilbert Laporte
Publication date: 19 February 2021
Published in: Mathematics and Computers in Simulation (Search for Journal in Brave)
Full work available at URL: https://idus.us.es/handle/11441/67846
Related Items
A computer approach to overtaking station track layout diagram design using graphs. An alternative track diagram proposal for these stations ⋮ Instance space analysis for a personnel scheduling problem
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Representing and solving finite-domain constraint problems using systems of polynomials
- The set of autotopisms of partial Latin squares
- Personnel scheduling: models and complexity
- Nullstellensätze for zero-dimensional Gröbner bases
- Rotating schedules
- Solving zero-dimensional algebraic systems
- A new efficient algorithm for computing Gröbner bases \((F_4)\)
- On decomposing systems of polynomial equations with finitely many solutions
- Efficient generation of rotating workforce schedules
- Survey, categorization, and comparison of recent tour scheduling literature
- On the complexity of manpower shift scheduling
- Slimgb: Gröbner bases with slim polynomials
- Personnel scheduling: a literature review
- Workforce scheduling with multiple objectives
- Gröbner bases and the number of Latin squares related to autotopisms of order \(\leq 7\)
- SHARPER COMPLEXITY BOUNDS FOR ZERO-DIMENSIONAL GRÖBNER BASES AND POLYNOMIAL SYSTEM SOLVING
- The art and science of designing rotating schedules
- On Manpower Scheduling Algorithms
- Combinatorial Nullstellensatz
- A Multiple-Shift Workforce Scheduling Model Under the 4-Day Workweek with Weekday and Weekend Labour Demands
- A general multi-shift scheduling system
- COMBINATORIAL APPROACHES FOR HARD PROBLEMS IN MANPOWER SCHEDULING
- A Three-Day Workweek Multiple-Shift Scheduling Model
- Counting Solutions of Knapsack Constraints