Minmax due-date assignment on a two-machine flowshop
From MaRDI portal
Publication:2241579
DOI10.1007/s10479-021-04212-yzbMath1476.90130OpenAlexW3195203789MaRDI QIDQ2241579
Publication date: 9 November 2021
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-021-04212-y
Minimax problems in mathematical programming (90C47) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35)
Related Items
Cites Work
- Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance
- A note: minmax due-date assignment problem with lead-time cost
- Due-window assignment scheduling in the proportionate flow shop setting
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment
- The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times
- Minimizing the maximum deviation of job completion time about a common due-date
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Minmax scheduling with acceptable lead-times: extensions to position-dependent processing times, due-window and job rejection
- A note on a due-date assignment on a two-machine flow-shop
- Minmax due-date assignment with a time window for acceptable lead-times
- A survey on scheduling problems with due windows
- Optimal two- and three-stage production schedules with setup times included
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- CON/SLK due date assignment and scheduling on a single machine with two agents
- Single Machine Scheduling with Flow Allowances