Solution procedures for block selection and sequencing in flat-bedded potash underground mines
DOI10.1007/s00291-021-00618-zzbMath1476.90132OpenAlexW3135360270MaRDI QIDQ2241902
Cinna Seifi, Marco Schulze, Jürgen Zimmermann
Publication date: 9 November 2021
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-021-00618-z
mixed integer linear programmingpriority rule-based procedureunderground miningblock selection and sequencingquality objective
Mixed integer programming (90C11) Nonlinear programming (90C30) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Machine scheduling in underground mining: an application in the potash industry
- Optimization-based heuristics for underground mine scheduling
- Optimizing mining complexes with multiple processing and transportation alternatives: an uncertainty-based approach
- Aggregation heuristic for the open-pit block scheduling problem
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- MineLib: a library of open pit mining problems
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- Comparative analysis of three metaheuristics for short-term open pit block sequencing
- Staff and machine shift scheduling in a German potash mine
- A local branching heuristic for the open pit mine production scheduling problem
- Optimizing the open pit-to-underground mining transition
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Short-term planning optimization model for underground mines
- Evolutionary approach for large-scale mine scheduling
- Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing
- A New Algorithm for the Open-Pit Mine Production Scheduling Problem
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach
This page was built for publication: Solution procedures for block selection and sequencing in flat-bedded potash underground mines