Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment
From MaRDI portal
Publication:2242316
DOI10.1016/j.ejor.2021.04.043zbMath1490.90005OpenAlexW3158895603MaRDI QIDQ2242316
Publication date: 9 November 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.04.043
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Mathematical modeling or simulation for problems pertaining to operations research and mathematical programming (90-10)
Uses Software
Cites Work
- Unnamed Item
- Bolstad
- Hadamard powers and totally positive matrices
- A linear Bayesian stochastic approximation to update project duration estimates
- Expert judgement for dependence in probabilistic modelling: a systematic literature review and future research directions
- Vines -- a new graphical model for dependent random variables.
- Statistical dependence through common risk factors: With applications in uncertainty analysis
- Using schedule risk analysis with resource constraints for project control
- Integrating risk into estimations of project activities' time and cost: a stratified approach
- A dependent project evaluation and review technique: a Bayesian network approach
- Hadamard products and multivariate statistical analysis
- An Approximate Method for Sampling Correlated Random Variables from Partially-Specified Distributions
- A Practical Way for Computing Approximate Lower and Upper Correlation Bounds
- Robust Optimization Made Easy with ROME
- Assessing Dependence: Some Experimental Results
- Uncertainty Analysis with High Dimensional Dependence Modelling
- Behavior of the NORTA method for correlated random vector generation as the dimension increases
- The contribution of mathematical modelling to the practice of project management
- Application of a Technique for Research and Development Program Evaluation
- Introduction to Bayesian Statistics
This page was built for publication: Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment