Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
From MaRDI portal
Publication:2248262
DOI10.1007/s11766-013-3146-2zbMath1299.90139OpenAlexW2114625142MaRDI QIDQ2248262
Jianming Dong, Jueliang Hu, Yong Chen
Publication date: 30 June 2014
Published in: Applied Mathematics. Series B (English Edition) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11766-013-3146-2
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27)
Cites Work
- Unnamed Item
- A two-stage hybrid flowshop with uniform machines and setup times
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Flowshop scheduling with identical jobs and uniform parallel machines
- Approximation algorithms for the multiprocessor open shop scheduling problem
- Minimizing makespan in hybrid flowshops
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- A note on makespan minimization in two-stage flexible flow shops with uniform machines
- Optimal two- and three-stage production schedules with setup times included
- Open Shop Scheduling to Minimize Finish Time
- A comparison of sequencing rules in static and dynamic hybrid flow systems
- A note on scheduling hybrid flow systems
This page was built for publication: Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage