A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations
From MaRDI portal
Publication:2253508
DOI10.1016/j.ejor.2012.09.029zbMath1292.90102OpenAlexW2027554386MaRDI QIDQ2253508
Jiang Cheng, Liping Liu, Ying-Hui Tang, Miao-Miao Yu
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.09.029
Related Items (19)
Optimal order-replacement policy for a phase-type geometric process model with extreme shocks ⋮ Reliability analysis of a \(k\)-out-of-\( n: G\) repairable system with single vacation ⋮ Threshold control policy for maintainability of manufacturing system with unreliable workstations ⋮ Computation and profit analysis of ak-out-of-n:Grepairable system underN-policy with multiple vacations and one replaceable repair facility ⋮ A multiple warm standby repairable system under N-policy with multiple vacations following Markovian arrival process ⋮ Modeling and analysis for a repairable system with multi-state components under K-mixed redundancy strategy ⋮ A repairable multi-state system with a general α-series process and an order-replacement policy ⋮ An extended geometric process repair model with delayed repair and slight failure type ⋮ Stability analysis of a repairable system with warning device and repairman vacation ⋮ Estimation of the ratio of a geometric process ⋮ Transient analysis of a \(k\)-out-of-\(n \text{:} G\) system with \(N\)-policy, repairmen's multiple vacations, and redundant dependency ⋮ On a random lead time and threshold shock model using phase‐type geometric processes ⋮ Availability and optimal maintenance policy for systems degrading in dynamic environments ⋮ Extended repair model for a deteriorating system with its repairman having vacations ⋮ A simple repairable system with warning device ⋮ Optimal replacement policy based on maximum repair time for a random shock and wear model ⋮ The ordering and replacement policy for the system with two types of failures ⋮ Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions ⋮ A survey on queues in machining system: Progress from 2010 to 2017
This page was built for publication: A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations