A lot-sizing and scheduling model for multi-stage flow lines with zero lead times
From MaRDI portal
Publication:2253519
DOI10.1016/j.ejor.2012.10.011zbMath1292.90124OpenAlexW2025279747MaRDI QIDQ2253519
Florian Sahling, Hartmut Stadtler
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.10.011
Related Items (7)
Multiple-stage multiple-machine capacitated lot-sizing and scheduling with sequence-dependent setup: a case study in the wheel industry ⋮ Simultaneous lotsizing and scheduling problems: a classification and review of models ⋮ Mixed integer programming based heuristics for the patient admission scheduling problem ⋮ Multi-stage simultaneous lot-sizing and scheduling for flow line production ⋮ A Benders decomposition approach for solving the offshore wind farm installation planning at the North Sea ⋮ Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty ⋮ Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Multi-level single machine lot-sizing and scheduling with zero lead times
- A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
- Lotsizing and scheduling for production planning
- Time continuity in discrete time models. New approaches for production planning in process industries.
- Capacitated lot-sizing with sequence dependent setup costs
- A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
- The Deterministic Dynamic Product Cycling Problem
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Proportional lot sizing and scheduling: Some extensions
- Campaign planning in time-indexed model formulations
- Production Planning by Mixed Integer Programming
This page was built for publication: A lot-sizing and scheduling model for multi-stage flow lines with zero lead times