Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study
From MaRDI portal
Publication:2273660
DOI10.1016/j.cor.2019.06.008zbMath1458.90228OpenAlexW2952205690MaRDI QIDQ2273660
Anna Rotondo, Georgios Dagkakis, Cathal Heavey
Publication date: 25 September 2019
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2019.06.008
Integer programming (90C10) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (2)
Metamodel-based simulation optimization considering a single stochastic constraint ⋮ A sorting based efficient heuristic for pooled repair shop designs
Cites Work
- Workforce planning incorporating skills: state of the art
- Combined discrete-event simulation and ant colony optimisation approach for selecting optimal screening policies for diabetic retinopathy
- Optimal workforce assignment to operations of a paced assembly line
- Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop environments
- A survey of dynamic scheduling in manufacturing systems
- Optimal dynamic assignment of a flexible worker on an open production line with specialists
- The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
- Assembly line team sizing with absenteeism
- A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems
- An evaluation of worker assignment policies in dual resource-constrained job shops with heterogeneous resources and worker transfer delays
- Design and operation of dynamic assembly lines using work-sharing
- Simulation optimization: a review of algorithms and applications
This page was built for publication: Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study