A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
DOI10.1016/j.ejor.2010.12.008zbMath1218.90107OpenAlexW2145829564MaRDI QIDQ2275613
Michael A. Martinez, Alexandra M. Newman
Publication date: 9 August 2011
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.12.008
determining a production scheduledetermining optimal operating policies at an underground mine production/scheduling applicationsmining/metals industriesproduction scheduling at an underground mine integer programming applications
Applications of mathematical programming (90C90) Case-oriented studies in operations research (90B90)
Related Items (15)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Conic mixed-integer rounding cuts
- Using aggregation to optimize long-term production planning at an underground mine
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Polyhedral results for the precedence-constrained knapsack problem
- Development of a heuristic project scheduler under resource constraints
- Exploring relaxation induced neighborhoods to improve MIP solutions
- Network optimization for the design of underground mines
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Heuristic scheduling of resource-constrained projects with cash flows
This page was built for publication: A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine