Planning of cascade hydropower stations with the consideration of long-term operations under uncertainties
From MaRDI portal
Publication:2280278
DOI10.1155/2019/1534598zbMath1432.90076OpenAlexW2991548334MaRDI QIDQ2280278
Publication date: 18 December 2019
Published in: Complexity (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2019/1534598
Stochastic programming (90C15) Management decision making, including multiple objectives (90B50) Discrete location and assignment (90B80)
Cites Work
- Eco-friendly location of small hydropower
- Stochastic short-term hydropower planning with inflow scenario trees
- Short-term hydropower production planning by stochastic programming
- A combined stochastic programming and optimal control approach to personal finance and pensions
- Modeling with Stochastic Programming
- Long- and Medium-term Operations Planning and Stochastic Modelling in Hydro-dominated Power Systems Based on Stochastic Dual Dynamic Programming
- Introduction to Stochastic Programming
- Model Building Techniques for the Correction of End Effects in Multistage Convex Programs
This page was built for publication: Planning of cascade hydropower stations with the consideration of long-term operations under uncertainties