Machine scheduling with soft precedence constraints
From MaRDI portal
Publication:2282538
DOI10.1016/j.ejor.2019.09.041zbMath1430.90298OpenAlexW2976166629WikidataQ127189726 ScholiaQ127189726MaRDI QIDQ2282538
Xiangtong Qi, Guanhua Li, An Zhang
Publication date: 8 January 2020
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2019.09.041
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (7)
A survey of job shop scheduling problem: the types and models ⋮ A hybrid algorithm for the vehicle routing problem with and/or precedence constraints and time windows ⋮ 0-1 mathematical programming models for flexible process planning ⋮ The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions ⋮ Applying ``peeling onion approach for competitive analysis in online scheduling with rejection ⋮ An optimal online algorithm for single-processor scheduling problem with learning effect ⋮ Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints
Cites Work
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- Scheduling of uniform parallel machines with s-precedence constraints
- On the complexity of scheduling unit-time jobs with or-precedence constraints
- Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A survey on how the structure of precedence constraints may change the complexity class of scheduling problems
- Complexity results for single-machine problems with positive finish-start time-lags
- The vessel schedule recovery problem (VSRP) -- a MIP model for handling disruptions in liner shipping
- Complexity of Scheduling under Precedence Constraints
- Scheduling with AND/OR Precedence Constraints
- Scheduling Tasks with AND/OR Precedence Constraints
- Bounds on Multiprocessing Timing Anomalies
- Scheduling
This page was built for publication: Machine scheduling with soft precedence constraints