Optimal maintenance strategy under renewable warranty with repair time threshold
DOI10.1016/J.APM.2016.11.015zbMath1446.90026OpenAlexW2560403244MaRDI QIDQ2284874
Dong Ho Park, Ki Mun Jung, Minjae Park
Publication date: 15 January 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2016.11.015
failure timerepair timerepair time thresholdexpected warranty costperiodic preventive maintenancetwo-factor warranty
Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10) Mathematical modeling or simulation for problems pertaining to operations research and mathematical programming (90-10)
Related Items (8)
Cites Work
- Optimal preventive maintenance warranty policy for repairable products with periodically increasing failure rate
- Optimal number of minimal repairs before ordering spare for preventive replacement
- Altered quasi-renewal concepts for modeling renewable warranty costs with imperfect repairs
- Optimal spare ordering policy for preventive replacement under cost effectiveness criterion
- Optimal replacement policy for a deteriorating system with increasing repair times
- A new repair-replace strategy for items sold with a two-dimensional warranty
- Cost models for age replacement policies and block replacement policies under warranty
- Maintenance models in warranty: a literature review
- A preventive maintenance policy for a standby system subject to internal failures and external shocks with loss of units
- An age replacement policy via the Bayesian method
- Cost Optimization of Periodic Preventive Maintenance
- A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul
- A Multivariate Exponential Distribution
- Determining optimal warranty periods from the seller's perspective and optimal out-of-warranty replacement age from the buyer's perspective
This page was built for publication: Optimal maintenance strategy under renewable warranty with repair time threshold