Formulation and solution of an optimal control problem for industrial project control
From MaRDI portal
Publication:2288881
DOI10.1007/S10479-019-03262-7zbMath1431.49026OpenAlexW2943865593WikidataQ127920533 ScholiaQ127920533MaRDI QIDQ2288881
Öncü Hazır, Klaus Werner Schmidt
Publication date: 20 January 2020
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-019-03262-7
Nonlinear programming (90C30) Optimality conditions for problems involving ordinary differential equations (49K15) Optimality conditions for solutions belonging to restricted classes (Lipschitz controls, bang-bang controls, etc.) (49K30)
Uses Software
Cites Work
- Unnamed Item
- Optimal investment in research and development under uncertainty
- Resource allocation with stochastic optimal control approach
- Determining the timing of project control points using a facility location model and simulation
- A survey of methods available for the numerical optimization of continuous dynamic systems
- Explicit formula for the optimal government debt ceiling
- Optimal control of service parameter for a perishable inventory system maintained at service facility with impatient customers
- Optimal expenditure patterns of a double-path engineering project
- Optimal timing of project control points
- A multicriteria decision model for assigning priority classes to activities in project management
- Time-cost trade-off via optimal control theory in Markov PERT networks
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Optimal resource allocation in new product development projects: a control-theoretic approach
This page was built for publication: Formulation and solution of an optimal control problem for industrial project control