Two-stage assembly scheduling problem for minimizing total tardiness with setup times
From MaRDI portal
Publication:2293429
DOI10.1016/j.apm.2016.03.037zbMath1471.90064OpenAlexW2333748727MaRDI QIDQ2293429
Asiye Aydilek, Ali Allahverdi, Harun Aydilek
Publication date: 5 February 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2016.03.037
Related Items (3)
Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time ⋮ An estimation of distribution algorithm for scheduling problem of flexible manufacturing systems using Petri nets
Cites Work
- Unnamed Item
- The third comprehensive survey on scheduling problems with setup times/costs
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- A branch and bound algorithm for the two-stage assembly scheduling problem
- Group-shop scheduling with sequence-dependent set-up and transportation times
- A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
- Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
- A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
- A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
- A survey of scheduling problems with setup times or costs
- A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
- Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
- Generating Experimental Data for Computational Testing with Machine Scheduling Applications
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Optimal scheduling of the 3-machine assembly-type flow shop
- The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
This page was built for publication: Two-stage assembly scheduling problem for minimizing total tardiness with setup times