Robust absolute single machine makespan scheduling-location problem on trees
From MaRDI portal
Publication:2294524
DOI10.1016/j.orl.2019.11.001OpenAlexW2987559581WikidataQ126830736 ScholiaQ126830736MaRDI QIDQ2294524
Publication date: 11 February 2020
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2019.11.001
Related Items (5)
Robust single machine makespan scheduling with release date uncertainty ⋮ Novel Formulations and Logic-Based Benders Decomposition for the Integrated Parallel Machine Scheduling and Location Problem ⋮ An exact framework for the discrete parallel machine scheduling location problem ⋮ Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date ⋮ 2-approximation algorithm for minmax absolute maximum lateness scheduling-location problem
Cites Work
- Solving scheduling and location problems in the plane simultaneously
- Algorithms for the robust 1-center problem on a tree
- Simultaneous scheduling and location (ScheLoc): The planar ScheLoc makespan problem
- Minmax-regret robust 1-median location on a tree
- Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Robust absolute single machine makespan scheduling-location problem on trees