Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty
From MaRDI portal
Publication:2298265
DOI10.1155/2019/3078234zbMath1435.90058OpenAlexW2954345779MaRDI QIDQ2298265
Zoran M. Gligorić, Čedomir R. Beljić, Suzana M. Lutovac, Miloš V. Gligorić, Vesna M. Damnjanović
Publication date: 20 February 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2019/3078234
Production models (90B30) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70) Boolean programming (90C09)
Cites Work
- A new method for solving fully fuzzy linear programming problems
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- A procedure for ordering fuzzy subsets of the unit interval
- The concept of a linguistic variable and its application to approximate reasoning. I
- Extensions of the TOPSIS for group decision-making under fuzzy environment
- Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines
- Fuzzy sets
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty