Group maintenance scheduling for two-component systems with failure interaction
From MaRDI portal
Publication:2310643
DOI10.1016/J.APM.2019.01.036zbMath1481.90150OpenAlexW2913636270WikidataQ128456489 ScholiaQ128456489MaRDI QIDQ2310643
Publication date: 6 April 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2019.01.036
Related Items (2)
A dynamic inspection and replacement policy for a two-unit production system subject to interdependence ⋮ Reliability-based opportunistic maintenance modeling for multi-component systems with economic dependence under base warranty
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- The availability model and parameters estimation method for the delay time model with imperfect maintenance at inspection
- On a stochastic survival model for a system under randomly variable environment
- Optimal lot sizing with regular maintenance interruptions
- A two-phase preventive maintenance policy considering imperfect repair and postponed replacement
- Analysis of the reliability and the maintenance cost for finite life cycle systems subject to degradation and shocks
- Reliability evaluation based on a dependent two-stage failure process with competing failures
- A model of imperfect preventive maintenance with dependent failure modes
- A powerful and efficient algorithm for numerical function optimization: artificial bee colony (ABC) algorithm
- Optimal age and block replacement policies for a multi-component system with failure interaction
- Study of two-component system with failure interaction
- On failure modeling
This page was built for publication: Group maintenance scheduling for two-component systems with failure interaction