Cost allocation in PPP projects: an analysis based on the theory of ``contracts as reference points
From MaRDI portal
Publication:2320664
DOI10.1155/2014/158765zbMath1422.91257OpenAlexW1986359568WikidataQ59038476 ScholiaQ59038476MaRDI QIDQ2320664
Qiang Xu, Xiaoling Wu, Yichen Peng, Jing Zhou
Publication date: 23 August 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2014/158765
Cites Work
This page was built for publication: Cost allocation in PPP projects: an analysis based on the theory of ``contracts as reference points