A constraint programming method for advanced planning and scheduling system with multilevel structured products
From MaRDI portal
Publication:2321546
DOI10.1155/2014/917685zbMath1419.90021OpenAlexW2064445653WikidataQ59038374 ScholiaQ59038374MaRDI QIDQ2321546
Yarong Chen, Dandan Lu, Yunfang Peng
Publication date: 23 August 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2014/917685
Cites Work
- Unnamed Item
- A mixed integer programming model for advanced planning and scheduling (APS)
- A branch and bound method for the job-shop problem with sequence-dependent setup times
- Heuristic factory planning algorithm for advanced planning and scheduling
- A note on ``A mixed integer programming model for advanced planning and scheduling (APS)
- Deterministic job-shop scheduling: Past, present and future
- Operational extended model formulations for advanced planning and scheduling systems
- Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
This page was built for publication: A constraint programming method for advanced planning and scheduling system with multilevel structured products