The iteration-complexity upper bound for the Mizuno-Todd-Ye predictor-corrector algorithm is tight
From MaRDI portal
Publication:2325239
DOI10.1007/978-3-030-12119-8_6zbMath1421.90083OpenAlexW2914757914MaRDI QIDQ2325239
Publication date: 9 September 2019
Full work available at URL: https://doi.org/10.1007/978-3-030-12119-8_6
Analysis of algorithms and problem complexity (68Q25) Numerical mathematical programming methods (65K05) Abstract computational complexity for mathematical programming problems (90C60) Linear programming (90C05) Interior-point methods (90C51)
This page was built for publication: The iteration-complexity upper bound for the Mizuno-Todd-Ye predictor-corrector algorithm is tight