Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks
From MaRDI portal
Publication:2336948
DOI10.1155/2015/809216zbMath1435.90070OpenAlexW1676586964WikidataQ59111995 ScholiaQ59111995MaRDI QIDQ2336948
Morteza Bagherpour, Mehdi Heydari, Siamak Noori, Gholamreza Norouzi
Publication date: 19 November 2019
Published in: Journal of Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/809216
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (1)
Cites Work
- Unnamed Item
- A fuzzy time-dependent project scheduling problem
- Criticality analysis of activity networks under interval uncertainty
- Fuzzy network technique for technological forecasting
- Applying fuzzy method for measuring criticality in project network
- Fuzzy project scheduling problem and its hybrid intelligent algorithm
- A simple approach to fuzzy critical path analysis in project networks
- The use of fuzzy variables in PERT
- A fuzzy robust scheduling approach for product development projects.
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Finding the distribution density of the time taken to fulfill the GERT network on the basis of equivalent simplifying transformations
- On the convergence of uncertain sequences
- Fuzzy-Network Planning - FNET
- A fuzzy set approach to activity scheduling for product development
- Further Results for the Linear Fuzzy Controller
- A Fuzzy Logic Approach for Determining Expected Values: A Project Management Application
- Fuzzy sets
- Critical path analysis in the network with fuzzy activity times