A quadratic edge-finding filtering algorithm for cumulative resource constraints
From MaRDI portal
Publication:2342594
DOI10.1007/s10601-013-9157-zzbMath1314.90038OpenAlexW2086693061MaRDI QIDQ2342594
Publication date: 29 April 2015
Published in: Constraints (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10601-013-9157-z
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (4)
A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\) ⋮ A MinCumulative resource constraint ⋮ Horizontally elastic edge-finder algorithm for cumulative resource constraint revisited ⋮ Synchronized sweep algorithms for scalable scheduling constraints
Uses Software
Cites Work
- Unnamed Item
- PSPLIB -- a project scheduling problem library
- Adjustment of heads and tails for the job-shop problem
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems
- A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\)
- Edge Finding for Cumulative Scheduling
- Timetable Edge Finding Filtering Algorithm for Discrete Cumulative Resources
- Max Energy Filtering Algorithm for Discrete Cumulative Resources
This page was built for publication: A quadratic edge-finding filtering algorithm for cumulative resource constraints