Interactive bicriterion decision support for a large scale industrial scheduling system
From MaRDI portal
Publication:2347596
DOI10.1007/s10479-013-1406-4zbMath1314.90073OpenAlexW2092844426WikidataQ58902976 ScholiaQ58902976MaRDI QIDQ2347596
Ioanna Makarouni, John Psarras, Eleftherios Siskos
Publication date: 5 June 2015
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-013-1406-4
Pareto optimalitymultiple objective programmingjob schedulingmixed-model assembly lineinteractive decision analysis
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- Unnamed Item
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Trends in multiple criteria decision analysis.
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- A multi-objective particle swarm for a flow shop scheduling problem
- An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- Heuristics and exact algorithms for solving the Monden problem
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- Nonlinear multiobjective optimization
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- Multicriteria optimization
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
- Multiple criteria decision analysis. State of the art surveys
- Minimizing variation of production rates in just-in-time systems: A survey
- A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
- An efficient, adaptive parameter variation scheme for metaheuristics based on the epsilon-constraint method
- Multicriteria scheduling problems: a survey
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Constructing robust crew schedules with bicriteria optimization
- Bicriteria sequencing for just-in-time mixed-model assembly lines
- A New Approach for Mixed-Model Assembly Line Sequencing
- A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
This page was built for publication: Interactive bicriterion decision support for a large scale industrial scheduling system