Corrigendum to: ``An FPTAS for the parallel two-stage flowshop problem
DOI10.1016/j.tcs.2017.05.016zbMath1371.68044OpenAlexW2619621338MaRDI QIDQ2357384
Mikhail Y. Kovalyov, Weitian Tong, Jianming Dong, Taibo Luo, Jueliang Hu, Xueshi Wang, Yin-Feng Xu, Guo-Hui Lin
Publication date: 13 June 2017
Published in: Theoretical Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.tcs.2017.05.016
dynamic programmingmultiprocessor schedulingmakespanfully polynomial-time approximation schemetwo-stage flowshop scheduling
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Approximation algorithms (68W25)
Related Items (7)
Cites Work
This page was built for publication: Corrigendum to: ``An FPTAS for the parallel two-stage flowshop problem