Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics
From MaRDI portal
Publication:2366078
DOI10.1016/0377-2217(93)90175-MzbMath0769.90050MaRDI QIDQ2366078
Stephen R. Lawrence, Thomas E. Morton
Publication date: 29 June 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (16)
A tabu-search heuristic for the flexible-resource flow shop scheduling problem ⋮ A multi-project management framework for new product development ⋮ Managing and modelling general resource transfers in (multi-)project scheduling ⋮ Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates ⋮ Resource-constrained multi-project scheduling problem: a survey ⋮ Multi-project scheduling with two-stage decomposition ⋮ Scheduling a two-stage flowshop under makespan constraint ⋮ A genetic algorithm for the resource constrained multi-project scheduling problem ⋮ Group technology in a hybrid flowshop environment: a case study ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times ⋮ An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment ⋮ Scheduling two parallel semiautomatic machines to minimize machine interference ⋮ Improving project cost estimation by taking into account managerial flexibility ⋮ A multicriteria heuristic method to improve resource allocation in multiproject scheduling ⋮ Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms
Cites Work
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- NP-complete scheduling problems
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- The Single Machine Early/Tardy Problem
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Project scheduling: The effects of problem structure on heuristic performance
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
This page was built for publication: Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics