Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
The project scheduling polyhedron: Dimension, facets and lifting theorems - MaRDI portal

The project scheduling polyhedron: Dimension, facets and lifting theorems

From MaRDI portal
Publication:2367366

DOI10.1016/0377-2217(93)90062-RzbMath0779.90036OpenAlexW2021200478MaRDI QIDQ2367366

Ramón Alvarez-Valdés Olaguíbel, José Manuel Tamarit Goerlich

Publication date: 25 August 1993

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(93)90062-r




Related Items (19)

Multi-mode resource constrained project scheduling problem along with contractor selectionA purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durationsModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsBranch-and-Cut-and-Price algorithms for the preemptive RCPSPSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationA polyhedral study of event-based models for the resource-constrained project scheduling problemIntegration of routing into a resource-constrained project scheduling problemA preemptive bound for the resource constrained project scheduling problemModeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparisonContinuous-time formulations for multi-mode project schedulingRobust energy planning in buildings with energy and comfort costsThe Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approachesProject scheduling with flexible resources: formulation and inequalitiesStrong valid inequalities for the resource-constrained scheduling problem with uniform resource requirementsImportant classes of reactions for the proactive and reactive resource-constrained project scheduling problemTowards merging binary integer programming techniques with genetic algorithmsOn the generation of circuits and minimal forbidden setsEvent-based MILP models for resource-constrained project scheduling problemsThe proactive and reactive resource-constrained project scheduling problem



Cites Work


This page was built for publication: The project scheduling polyhedron: Dimension, facets and lifting theorems