The project scheduling polyhedron: Dimension, facets and lifting theorems
DOI10.1016/0377-2217(93)90062-RzbMath0779.90036OpenAlexW2021200478MaRDI QIDQ2367366
Ramón Alvarez-Valdés Olaguíbel, José Manuel Tamarit Goerlich
Publication date: 25 August 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90062-r
inequalitiespolyhedronresource constraintsproject scheduling problemprecedence relationsfacet-defining properties
Programming involving graphs or networks (90C35) Special polytopes (linear programming, centrally symmetric, etc.) (52B12) Deterministic scheduling theory in operations research (90B35)
Related Items (19)
Cites Work
- Scheduling subject to resource constraints: Classification and complexity
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Maximal Flow Through a Network
- On the facial structure of scheduling polyhedra
- Lifting the facets of zero–one polytopes
- Technical Note—A Note on Zero-One Programming
- Technical Note—Facets and Strong Valid Inequalities for Integer Programs
- Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm
This page was built for publication: The project scheduling polyhedron: Dimension, facets and lifting theorems