Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint - MaRDI portal

Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint

From MaRDI portal
Publication:2371343

DOI10.1016/j.ejor.2006.10.005zbMath1180.90114OpenAlexW1993862978MaRDI QIDQ2371343

Joachim Breit

Publication date: 4 July 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.10.005




Related Items (18)

Approximation algorithms for the single-machine scheduling with a period of maintenanceOptimizing the half-product and related quadratic Boolean functions: approximation and scheduling applicationsMinimizing the makespan on a single machine with flexible maintenances and jobs' release datesSingle Machine Scheduling with an Availability Constraint and RejectionMinimizing total completion time on a single machine with a flexible maintenance activitySupply chain scheduling problem in the hospital with periodic working time on a single machineMinimizing total weighted completion time with an unexpected machine unavailable intervalSingle-machine scheduling with periodic maintenance to minimize makespan revisitedThe symmetric quadratic knapsack problem: approximation and scheduling applicationsMinimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraintFast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release datesIntegrated scheduling of production and delivery on a single machine with availability constraintComplexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion timeSingle-machine scheduling with machine unavailability periods and resource dependent processing timesSingle machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability intervalMinimizing the total completion time on a single machine with the learning effect and multiple availability constraintsA note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespanTwo simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval



Cites Work




This page was built for publication: Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint