Estimation of absolute error in scheduling problems of minimizing the maximum lateness
From MaRDI portal
Publication:2377526
DOI10.1134/S1064562407040230zbMath1162.90012MaRDI QIDQ2377526
Publication date: 19 January 2009
Published in: Doklady Mathematics (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (4)
Metrics in scheduling problems ⋮ Polynomially solvable subcases for the approximate solution of multi-machine scheduling problems ⋮ A metric approach for scheduling problems with minimizing the maximum penalty ⋮ Metric approach for finding approximate solutions of scheduling problems
Cites Work
This page was built for publication: Estimation of absolute error in scheduling problems of minimizing the maximum lateness