Polynomial time algorithms for the UET permutation flowshop problem with time delays
From MaRDI portal
Publication:2384903
DOI10.1016/j.cor.2006.03.018zbMath1141.90020OpenAlexW2161560287MaRDI QIDQ2384903
Alix Munier Kordon, Djamal Rebaine
Publication date: 10 October 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2006.03.018
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints ⋮ Analysis of heuristics for the UET two-machine flow shop problem with time delays ⋮ Unnamed Item
Cites Work
- Unnamed Item
- Unnamed Item
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Permutation flowshop scheduling problems with maximal and minimal time lags
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- Flowshop and Jobshop Schedules: Complexity and Approximation
This page was built for publication: Polynomial time algorithms for the UET permutation flowshop problem with time delays