A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\)
From MaRDI portal
Publication:2393571
DOI10.1007/s13226-013-0005-zzbMath1282.90070OpenAlexW1990265760MaRDI QIDQ2393571
Roger Kameugne, Laure Pauline Fotso
Publication date: 8 August 2013
Published in: Indian Journal of Pure \& Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s13226-013-0005-z
global constraintsconstraint-based schedulingcumulative resourcescumulative \(\theta\)-treeenergy envelopenot-first/not-last
Related Items (5)
Linear-time filtering algorithms for the disjunctive constraint and a quadratic filtering algorithm for the cumulative not-first not-last ⋮ A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\) ⋮ Horizontally elastic edge-finder algorithm for cumulative resource constraint revisited ⋮ Constraint propagation on GPU: a case study for the cumulative constraint ⋮ A quadratic edge-finding filtering algorithm for cumulative resource constraints
Uses Software
Cites Work
- Unnamed Item
- PSPLIB -- a project scheduling problem library
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- On not-first/not-last conditions in disjunctive scheduling
- Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems
- A quadratic edge-finding filtering algorithm for cumulative resource constraints
- A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\)
- Edge Finding for Cumulative Scheduling
- Timetable Edge Finding Filtering Algorithm for Discrete Cumulative Resources
This page was built for publication: A cumulative not-first/not-last filtering algorithm in \(O(n^2 \log(n))\)