A resource type analysis of the integrated project scheduling and personnel staffing problem
From MaRDI portal
Publication:2398432
DOI10.1007/s10479-015-2033-zzbMath1368.90074OpenAlexW1845984733MaRDI QIDQ2398432
Mario Vanhoucke, Broos Maenhout
Publication date: 16 August 2017
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-015-2033-z
Related Items (5)
An exact algorithm for an integrated project staffing problem with a homogeneous workforce ⋮ A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ A goal programming model for staff scheduling at a telecommunications center ⋮ A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing ⋮ A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
Cites Work
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs
- An acyclic days-off scheduling problem
- Methods to solve multi-skill project scheduling problem
- Scheduling projects with heterogeneous resources to meet time and quality objectives
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Single-shift off-day scheduling of a hierarchical workforce with variable demands
- Four-day workweek scheduling with two or three consecutive days off
- An efficient two-phase algorithm for cyclic days-off scheduling.
- Staff scheduling and rostering: a review of applications, methods and models.
- Models and algorithms for a staff scheduling problem
- Optimum workforce scheduling under the (14, 21) days-off timetable
- Integer programming to schedule a hierarchical workforce with variable demands
- Personnel scheduling: a literature review
- Scheduling and staffing multiple projects with a multi-skilled workforce
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Using compressed workweeks to save labour cost
- Branch-and-Price: Column Generation for Solving Huge Integer Programs
- A heuristic approach to project staffing
- The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
- An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Cyclic Scheduling via Integer Programs with Circular Ones
- A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering
- Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements
- Scheduling of Work Forces Required in Continuous Operations Under Alternative Labor Policies
- Work Stretch Properties for the Scheduling of Continuous Operations Under Alternative Labor Policies
- Workforce Scheduling with Cyclic Demands and Day-Off Constraints
- A set-processing algorithm for scheduling staff on 4-day or 3-day work weeks
- Using mixed integer programming to design employee rosters
- Bounded flexibility in days-on and days-off scheduling
- Scheduling Full-Time and Part-Time Staff to Meet Cyclic Requirements
- Optimal Scheduiing of Two Consecutive Idle Periods
- Efficient optimization of cyclic labor days-off scheduling
- The resource renting problem subject to temporal constraints
- Compressed Workweek Scheduling With Days Off Consecutivity, Weekend Off Frequency, And Work Stretch Constraints
This page was built for publication: A resource type analysis of the integrated project scheduling and personnel staffing problem