Mathematical model and algorithm for the reefer mechanic scheduling problem at seaports
From MaRDI portal
Publication:2398778
DOI10.1155/2017/4730253zbMath1369.90083OpenAlexW2594876837WikidataQ59143187 ScholiaQ59143187MaRDI QIDQ2398778
Publication date: 21 August 2017
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2017/4730253
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Unnamed Item
- Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance
- Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
- Online scheduling to minimize modified total tardiness with an availability constraint
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Differential evolution -- a simple and efficient heuristic for global optimization over continuous spaces
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints
- Operations research at container terminals: a literature update
- A critical-shaking neighborhood search for the yard allocation problem
- An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals
- Branch-and-bound algorithm for total weighted tardiness minimization on parallel machines under release dates assumptions
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
- Parallel machine scheduling with a common due window
This page was built for publication: Mathematical model and algorithm for the reefer mechanic scheduling problem at seaports