A data intensive heuristic approach to the two-stage streaming scheduling problem
From MaRDI portal
Publication:2402350
DOI10.1016/J.JCSS.2017.01.005zbMath1372.68049OpenAlexW2587389608MaRDI QIDQ2402350
Wei Liang, Min Wu, Chun-hua Hu, Qun Jin
Publication date: 7 September 2017
Published in: Journal of Computer and System Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.jcss.2017.01.005
Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
Cites Work
- A taxonomy of flexible flow line scheduling procedures
- Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
- The hybrid flow shop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Task Scheduling on Adaptive Multi-Core
- Bounds for Certain Multiprocessing Anomalies
This page was built for publication: A data intensive heuristic approach to the two-stage streaming scheduling problem