A hybrid MCDM technique for risk management in construction projects
From MaRDI portal
Publication:2415050
DOI10.3390/SYM10020046zbMath1412.91038OpenAlexW2769128709WikidataQ57703005 ScholiaQ57703005MaRDI QIDQ2415050
Kajal Chatterjee, Krishnendu Adhikary, Jolanta Tamošaitienė, Samarjit Kar, Edmundas Kazimieras Zavadskas
Publication date: 20 May 2019
Published in: Symmetry (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/sym10020046
risk managementanalytical network process (ANP)multi-criteria decision-making (MCDM)multi-attributive border approximation area comparison (MABAC)consistent fuzzy preference relation (CFPR)construction project riskD number
Related Items (2)
Generate two-dimensional belief function based on an improved similarity measure of trapezoidal fuzzy numbers ⋮ An improved multi-criteria emergency decision-making method in environmental disasters
Cites Work
- Some issues on consistency of fuzzy preference relations.
- A modified TOPSIS method based on \(D\) numbers and its applications in human resources selection
- An improved belief entropy and its application in decision-making
- Iterative speedup by utilizing symmetric data in pricing options with two risky assets
- A FUZZY AHP MULTI-CRITERIA DECISION-MAKING APPROACH APPLIED TO COMBINED COOLING, HEATING, AND POWER PRODUCTION SYSTEMS
This page was built for publication: A hybrid MCDM technique for risk management in construction projects