Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
From MaRDI portal
Publication:2428924
DOI10.1016/j.apm.2011.07.011zbMath1236.90049OpenAlexW1981207682MaRDI QIDQ2428924
J. Behnamian, Fariborz Jolai, Seyyed Mohammad Taghi Fatemi Ghomi, O. Amirtaheri
Publication date: 21 April 2012
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2011.07.011
Related Items (3)
A two-stage flow shop scheduling problem with transportation considerations ⋮ Coordination of production and transportation in supply chain scheduling ⋮ Matheuristic for the decentralized factories scheduling problem
Cites Work
- Unnamed Item
- A hybrid two-stage transportation and batch scheduling problem
- Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
- A note on the complexity of flow shop scheduling with transportation constraints
- Efficient scheduling algorithms for a single batch processing machine
- Minimizing makespan on a single burn-in oven in semiconductor manufacturing
- Machine scheduling with job delivery coordination
- Complexity of flow shop scheduling problems with transportation constraints
- Scheduling with batching: A review
- Logistics scheduling with batching and transportation
- Scheduling Parts in a Combined Production-transportation Work Cell
- Integrated Scheduling of Production and Distribution Operations
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Batching and Scheduling Jobs on Batch and Discrete Processors
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling Groups of Jobs on a Single Machine
- Machine scheduling with transportation considerations
- Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
This page was built for publication: Realistic two-stage flowshop batch scheduling problems with transportation capacity and times