Shared resources in production systems: (max,+) analysis
From MaRDI portal
Publication:2431524
DOI10.1504/IJMOR.2011.038907zbMath1210.93047MaRDI QIDQ2431524
Olivier Boutin, Anne L'Anton, Bertrand Cottenceau, Jean-Jacques Loiseau
Publication date: 15 April 2011
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
modellinginterval analysisPetri netsdioidsproduction managementdiscrete event systemsconflictsshared resourcesjob shopsmanufacturing cells(max, +) linear systemspseudo-periodic assignment policy
Production models (90B30) Discrete event control/observation systems (93C65) Algebraic methods (93B25)
This page was built for publication: Shared resources in production systems: (max,+) analysis