The multiple-job repair kit problem
From MaRDI portal
Publication:2433467
DOI10.1016/j.ejor.2005.05.023zbMath1142.90313OpenAlexW2100282736MaRDI QIDQ2433467
Publication date: 27 October 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://repub.eur.nl/pub/905
Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27) Inventory, storage, reservoirs (90B05)
Related Items
Optimization of Industrial-Scale Assemble-to-Order Systems, Timing intermittent demand with time-varying order-up-to levels, Optimising a general repair kit problem with a service constraint, The repair kit problem with imperfect advance demand information, Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests, The added value of advance demand information for the planning of a repair kit, The repair kit problem with positive replenishment lead times and fixed ordering costs, OR in spare parts management: a review
Cites Work