The stochastic U-line balancing problem: a heuristic procedure
From MaRDI portal
Publication:2433547
DOI10.1016/j.ejor.2004.10.031zbMath1142.90382OpenAlexW2078164785MaRDI QIDQ2433547
Wen-Chyuan Chiang, Timothy L. Urban
Publication date: 27 October 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2004.10.031
Related Items (11)
Second order conic approximation for disassembly line design with joint probabilistic constraints ⋮ Designing energy-efficient serial production lines: the unpaced synchronous line-balancing problem ⋮ A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem ⋮ A decomposition based solution algorithm for U-type assembly line balancing with interval data ⋮ Balancing of parallel U-shaped assembly lines ⋮ Balancing stochastic parallel assembly lines ⋮ Stochastic assembly line balancing: general bounds and reliability-based branch-and-bound algorithm ⋮ Empirical working time distribution-based line balancing with integrated simulated annealing and dynamic programming ⋮ A comparative analysis of meta-heuristic methods on disassembly line balancing problem with stochastic time ⋮ Balancing of simple assembly lines under variations of task processing times ⋮ Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
Cites Work
- Unnamed Item
- The application of a tabu search metaheuristic to the assembly line balancing problem
- Note. Optimal Balancing of U-Shaped Assembly Lines
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
- Performance of Bucket Brigades When Work Is Stochastic
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- A Dynamic Programming Approach to Stochastic Assembly Line Balancing
- A parallel station heuristic for the mixed-model production line balancing problem
- ULINO: Optimally balancing U-shaped JIT assembly lines
- Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
- Stochastic assembly line balancing using simulated annealing
- A stochastic approach to assembly line balancing
- The stochastic U-line balancing problem
- Balancing of U-type assembly systems using simulated annealing
- A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
- U-OPT: An analysis of exact U-shaped line balancing procedures
- The U-line Line Balancing Problem
- Safety Stock versus Safety Time in MRP Controlled Production Systems
This page was built for publication: The stochastic U-line balancing problem: a heuristic procedure