Integrated batch sizing and scheduling on a single machine
From MaRDI portal
Publication:2434256
DOI10.1007/S10951-011-0229-XzbMath1280.90038OpenAlexW2029771440MaRDI QIDQ2434256
Safia Kedad-Sidhoum, Öncü Hazır, Philippe Chrétienne
Publication date: 5 February 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-011-0229-x
Related Items (3)
Batching scheduling in a two-level supply chain with earliness and tardiness penalties ⋮ Coordination of production and transportation in supply chain scheduling ⋮ Batch sizing and just-in-time scheduling with common due date
Cites Work
- Batch sizing and job sequencing on a single machine
- The coordination of scheduling and batch deliveries
- Batching in single operation manufacturing systems
- The complexity of one-machine batching problems
- Batching identical jobs
- Scheduling with batching: A review
- A survey of scheduling problems with setup times or costs
- Batch scheduling in a two-level supply chain -- a focus on the supplier
- An Iterated Dynasearch Algorithm for the Single-Machine Total Weighted Tardiness Scheduling Problem
- Supply Chain Scheduling: Batching and Delivery
- Scheduling job families about an unrestricted common due date on a single machine
- Scheduling Groups of Jobs on a Single Machine
This page was built for publication: Integrated batch sizing and scheduling on a single machine