Solving RCPSP/max by lazy clause generation
DOI10.1007/s10951-012-0285-xzbMath1280.90067OpenAlexW2125886152MaRDI QIDQ2434317
Thibaut Feydy, Andreas Schutt, Peter J. Stuckey, Mark G. Wallace
Publication date: 5 February 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11343/282698
project schedulingtime windowsconstraint programmingresource constraintsgeneralized precedence constraintslazy clause generation
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Boolean programming (90C09)
Related Items (15)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Explaining the \texttt{cumulative} propagator
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
- Scheduling subject to resource constraints: Classification and complexity
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Propagation via lazy clause generation
- A Boolean satisfiability approach to the resource-constrained project scheduling problem
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- On a routing problem
- Iterative Flattening Search on RCPSP/max Problems: Recent Developments
- Logic Programming
- A Computing Procedure for Quantification Theory
- A machine program for theorem-proving
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- A constraint-based method for project scheduling with time windows
This page was built for publication: Solving RCPSP/max by lazy clause generation